Fenland


Technical information

Location Cambridgeshire
Capacity 20.4 MWp
ROCs 1.4
EPC Hanwha Q Cells
Panels Hanwha Q Cells
Inverter SMA
Operational Since Mar-15

Project Description

Fenland is located in Cambridgeshire and has a capacity of 20.4MW. The plant was acquired in January 2016 and has been operational since March 2015. The site has produced 3.2GWh (+11.5% vs budget) since acquisition to 31 March 2016. Fenland is part of the Three Kings portfolio which has project level debt, the equity acquisition cost was £7.6m and the investment value at year end was £8.4m, which is 2.2% of the portfolio value.


Gallery