Green End


Technical information

Location Cambridgeshire
Capacity 24.8 MWp
ROCs 1.4
EPC Hanwha Q Cells
Panels Hanwha Q Cells
Inverter SMA
Operational Since Mar-15

Project Description

Green End is a 24.8MW site located in Cambridgeshire. The plant was acquired in January 2016 and has been operational since March 2015. The site has produced 3.9GWh (+12.8% vs budget) since acquisition to 31 March 2016. Green End is part of the Three Kings portfolio which has project level debt, the equity acquisition cost was £9.2m and the investment value at year end was £10.1m, which is 2.6% of the portfolio value.